First Rendering

First Rendering
Brian Jennings First Crack At A Design

Sunday, May 16, 2010

Fab work is complete, Disassembly in Process


We finished the fabrication this week (except for the subframe connectors. We got the trans mount done and got all of the other welding completed. I tore apart the dash at the house so I could paint the pieces and dye the dash pad. I also got the engine on the super-trick rotating engine stand and re-gasketed the whole thing. Got the rear-main replaced as well. This week I will get the high rate valve springs installed, adjust the valves and paint/install the valve covers. Check out the pics, there is a cool shot of the turbo being test fit. Not only did it fit, but the HX-40 downpipe from the donor truck actually fits too!

1 comment:

  1. Great work E. This project seems to be moving along very nicely.

    ReplyDelete